Cloud migration
consultancy.

6R disposition, migration waves, cutover planning, and validated migration, without the business disruption.

Brief us See work
What we build

Our cloud migration consultancy moves your workloads to AWS, Azure, or GCP in controlled waves, assessment, disposition, rehosting and replatforming, cutover, and validation, without the outage everyone fears.

Problem · approach · outcome.

How we run this kind of work
01 · Problem

Migrations stall on dependencies nobody mapped.

The workload itself is rarely the hard part, it's the undocumented dependency on a shared file server, a hardcoded IP, or a batch job nobody owns. Migrations fail when the discovery was superficial.

02 · Approach

Discover deeply, migrate in waves.

Dependency discovery, 6R disposition per workload, migration waves grouped by dependency, automated migration tooling where possible, and a cutover plan with rollback for every wave.

03 · Outcome

Migration as a series of non-events.

Each wave cuts over on its planned window, validated against the old environment, with rollback ready. No big-bang, no all-hands outage.

What we ship.

6 modules · extensible
F-01

Dependency discovery

Automated and manual dependency mapping before any workload moves.

F-02

6R disposition

Rehost, replatform, refactor, repurchase, retain, retire, decided per workload.

F-03

Migration tooling

AWS MGN, Azure Migrate, and database migration services where they fit.

F-04

Wave planning

Workloads grouped into dependency-safe waves with cutover windows.

F-05

Cutover & rollback

Every wave has a validated cutover plan and a rollback.

F-06

Post-migration validation

Reconciliation against the source environment before decommission.

Tech stack.

Production-tested
AWS
MGNDMSMigration Hub
Azure
Azure MigrateDMS
GCP
Migrate to VMsDMS
Validation
parallel-runreconciliation

Move to cloud
without the outage?

Cloud practice · migration
Get a quote

Cloud migration consultancy FAQs.

Q-01Will there be downtime?
Minimal, most workloads migrate with near-zero downtime using replication-based tooling. Cutover windows are planned and short.
Q-02How do you handle dependencies?
Deep dependency discovery before wave planning, the most common cause of migration failure.
Q-03Lift-and-shift or modernise?
Both, disposition is per workload. Some rehost; some replatform. See cloud advisory for the strategy.
Q-04What about rollback?
Every wave has a rollback plan validated before cutover.